: TS govt finalises depts to build 14 bridges and 1 link road across Musi, Esa #IndiaNEWS #Hyderabad Hyderabad: The State government has finalised the departments that will build the 14 bridges and
TS govt finalises depts to build 14 bridges and 1 link road across Musi, Esa #IndiaNEWS #Hyderabad
Hyderabad: The State government has finalised the departments that will build the 14 bridges and one link road with an estimated cost of Rs 545 crore across the Rivers Musi and Esa.
While six bridges and a link road will be constructed by the Hyderabad Metropolitan Development Authority (HMDA), four bridges will be built by the Greater Hyderabad Municipal Corporation (GHMC) three by the Hyderabad Road Development Corporation Limited (HRDCL) and one bridge by the Quli Qutub Shah Urban Development Authority (QQSUDA).
High level bridges at missing link corridor number 99 on Musi River, connecting Sun City and Chintalmet (Power Corridor) on Esa River and connecting Inner Ring Road and Kismathpur road will be built by the HRDCL.
High level bridges connecting Ibrahimbagh causeway on Musi River, at Musarambagh and Chaderghat and a bridge parallel to the existing bridge at Attapur will be taken up by the GHMC.
A bridge connecting Uppal layout to south bank of Musi river, high level bridge connecting Manchirevula village and Narsingi, high level bridge at Budvel IT Park, another bridge at Budvel IT Park and connecting roads parallel to ESA River, high level bridge connecting Pratapsingaram to Gowrelly, bridge connecting Hydershakote to Ramdevguda and link road to Manchirevula bridge will be built by the HMDA and the pedestrian bridge at Afzalgunj will be built by QQSUDA.
Latest stock market news Twitter alternate of India
0 Reactions React
More posts by @newsMNC
: Telangana Congress leaders flays Rajagopal Reddy, BJP #IndiaNEWS #News Hyderabad: Telangana Congress leaders on Wednesday launched a scathing attack on Munugode Congress MLA Komatireddy Rajagopal
0 Reactions React
: Medak: Tirupathi-Nanded express hits buffalo, stopped for 45 minutes #IndiaNEWS #Mulugu Medak: The Tirupathi-Nanded express was stopped for 45 minutes at Sankapur in Narsingi Mandal on Wednesday as
0 Reactions React
0 Comments
Sorted by latest first Latest Oldest Best
Terms of Use Create Support ticket Your support tickets Stock Market News! © babycheers.com2024 All Rights reserved.